A multinational corporation specializing in gas technologies, and services needed a solution to isolate and seal a pipe connection prone to corrosion. This particular pipe transported Hydrogen and Nitrogen Gas, […]
An oil and gas operator located in Australia approached GPT Industries as they were encountering an issue with two flange connections that were experiencing leakage issues within hours of installation. […]
A long-established midstream oil and gas operator had been experiencing long term issues with Phenolic isolation gaskets. They approached GPT seeking a solution that would give them longer service life […]
A water authority situated in Texas approached GPT industries to support a large-scale project with the aim of shifting underground well water to surface water. The project which spans 79.8 […]
GPT_EVO_Electrical Bridging_06.2022(F)A problem that is becoming more and more common place in industry is electrical bridging. For years, this customer has battled losing isolation across the flange isolation kit, not […]
On a Flare Gas Recovery Unit, there are Carbon Steel flanges being bolted to A2205 Duplex Stainless-Steel flanges on the flare gas piping. As a result of the dissimilar metal, […]
A utility company operating out of the east of America approached GPT as they had encountered a leak and isolation failure following hydro-testing of their pipeline. The monolithic isolation joint […]
An operator of an established Oil field in the UAE approached GPT after encountering the same persistent problem with its flange isolation gaskets (kit) across two sites. Two years after […]
A multinational gases, technologies and services company was seeking an isolation solution for a pipe connection which had been prone to corrosion, the pipe carried Hydrogen and Nitrogen Gas, it […]
A global oil and gas operator was seeking a gasket solution for a new offshore platform that was to operate in the Gulf of Mexico. The large-scale offshore platform which […]
Pipeline operators based on the west coast of the United States started to notice that their flanges were beginning to experience shorts. Upon inspection it was identified that this was […]
A gas compressor manufacturer was looking for an insulation kit to be fitted to one of its compressors, located on an offshore platform within the Persian-Arabic Gulf. As the gas […]
An operator of an established Oil field in the UAE approached GPT after encountering the same persistent problem with its flange isolation gaskets (kit) at two sites. Two to three […]
Engineering firm had a refinery client that had a high temperature and pressure application that also needed to be fire rated.
An expansion device was being installed downstream of a control valve. This expansion device was made of SS316, while the upstream piping to the device was A106B, and the downstream […]